Drawing Register Template

A drawing register lists every drawing on a project with its number, title, current revision, status and the date it was issued. It is the single record of which version of each drawing is current, so contractors and consultants never build from a superseded sheet.

Who it's for: Architects, interior designers, engineers and project managers issuing drawings on building projects.

Free, no email needed. Google Sheets: download the .xlsx, then File > Import > Upload.

Preview

These are the real columns with example rows. Click Try it here to type your own rows and download them.

Drawing no.TitleDisciplineScaleRevisionStatusIssue dateIssued toRevision note
A-101Ground Floor PlanArchitecture1:100DFor construction2026-09-02Contractor, clientKitchen wall moved 300mm
A-201North ElevationArchitecture1:100CFor approval2026-09-12Client, structural engineerWindow heights revised per client
S-101Foundation PlanStructure1:50BFor construction2026-08-19ContractorPad footing sizes updated
ID-301Kitchen Joinery DetailsInteriors1:20AFor information2026-09-15JoinerFirst issue

What goes in each column

ColumnWhat goes in itExample
Drawing no.Unique drawing numberA-201
TitleWhat the drawing showsNorth Elevation
DisciplineArchitecture, Structure, Interiors, MEPArchitecture
ScaleDrawing scale1:100
RevisionCurrent revision letter or numberC
StatusFor information, For approval, For construction, SupersededFor approval
Issue dateDate this revision was issued2026-09-12
Issued toWho received itClient, structural engineer
Revision noteWhat changed in this revisionWindow heights revised per client

Why these columns: Most drawing mistakes on site come from someone using an old revision. The Status column, especially Superseded, and a dated Revision note are what make a register trustworthy.

How to use it in 5 steps

  1. Agree a numbering system before the first issue, for example discipline letter plus number.
  2. Add every drawing to the register the moment it is created, even before issue.
  3. When you issue a revision, update Revision, Status, Issue date and Revision note in the same row.
  4. Mark old drawings Superseded instead of deleting them, so the history stays visible.
  5. Send the register with every drawing issue so everyone checks they have the current revision.

Spreadsheet, dedicated software, or Notion?

OptionBest forFalls short when
This spreadsheetSmall projects, sole practitioners, quick setupRevision history is overwritten unless you add rows
Document control software (common data environments)Large projects with many consultantsCostly and heavy for small practices
Notion versionDrawings linked to projects and phases, with full revision historyNeeds Notion

If the free spreadsheet does everything you need, stick with it. The Notion version is for when you want the pieces connected.

Want it connected? Architecture Firm OS

The spreadsheet is one table. The Notion system links it to everything around it:

See Architecture Firm OS

Instant duplicate link after purchase.

Questions

What is the difference between a drawing register and a drawing issue sheet?

The register lists every drawing and its current revision. An issue sheet records one issue: which drawings went to whom on a date. Many small practices combine them.

How should drawings be numbered?

A common approach is a discipline prefix and a number, such as A-101 for architecture plans. Pick one system and keep it for the whole project.

Should I delete superseded drawings from the register?

No. Mark them Superseded so the history remains traceable.

Does this work for interior design projects?

Yes. Use the Interiors discipline and add joinery or finishes drawings as needed.