FF&E Schedule Template

An FF&E schedule lists every piece of furniture, fixture and equipment specified for a project, organised by room, with its vendor, quantity, cost, lead time and order status. Interior designers use it to get client approval, place orders, and make sure everything arrives before installation.

Who it's for: Interior designers, design studios and project managers handling furniture procurement.

Free, no email needed. Google Sheets: download the .xlsx, then File > Import > Upload.

Preview

These are the real columns with example rows. Click Try it here to type your own rows and download them.

Item codeRoomItemVendorQtyUnit costTotalLead time (weeks)StatusInstall date
LR-03Living roomLinen sectional sofa, oatLocal upholsterer12,4002,40010Ordered2026-12-01
LR-07Living roomBrass pendant clusterLighting supplier18608606Client approved2026-12-01
KT-02KitchenCounter stools, walnutFurniture showroom33109304Delivered2026-11-20
BD-01Primary bedroomCustom linen draperyWorkroom25401,08012Specified2026-12-05

What goes in each column

ColumnWhat goes in itExample
Item codeYour referenceLR-03
RoomWhere it goesLiving room
ItemName and descriptionLinen sectional sofa, oat
VendorSupplierLocal upholsterer
QtyQuantity1
Unit costCost per item2,400
TotalQty x unit cost (calculated)2,400
Lead time (weeks)Weeks from order to delivery10
StatusSpecified, Client approved, Ordered, Delivered, InstalledOrdered
Install datePlanned installation2026-12-01

Why these columns: The most common FF&E problem is not cost but timing: a sofa with a 12-week lead time ordered 8 weeks before install. Putting Lead time next to Install date and Status makes that risk visible.

How to use it in 5 steps

  1. List items room by room during design, even before choosing vendors.
  2. Get client approval on the schedule before ordering, and record it in Status.
  3. Check Lead time against Install date. Anything that cannot arrive in time needs an alternative now.
  4. Update Status as orders move, and note any backorders straight away.
  5. Use the totals as your budget check before and after ordering.

Spreadsheet, dedicated software, or Notion?

OptionBest forFalls short when
This spreadsheetSmall projects, quick budgets, easy client sharingNo link to vendors, invoices or client approvals
Specialist design softwareLarge studios with many projectsMonthly subscriptions and setup time
Notion versionProjects, rooms, products, orders and payments linkedNeeds Notion

If the free spreadsheet does everything you need, stick with it. The Notion version is for when you want the pieces connected.

Want it connected? Interior Design Firm OS

The spreadsheet is one table. The Notion system links it to everything around it:

See Interior Design Firm OS

Instant duplicate link after purchase.

Questions

What does FF&E stand for?

Furniture, fixtures and equipment: the movable items in a space, as opposed to the building itself.

What is the difference between an FF&E schedule and a budget?

The schedule lists every item with specs and status; the budget is the cost total. This template gives you both.

Should I show the FF&E schedule to clients?

Many designers share a version for approvals. Hide cost columns if you mark up products.

How do I handle backorders?

Set Status back to Ordered, add the new date, and check whether the install date still works.